Residential

Workshop Foundation Dig

Project Details

Year

2022

Location

Vic West

Client

Scope

We cleared the site down to hard clay, prepping for a workshop build. Alongside, we installed essential sewer, water, and storm drain lines. Despite the cramped conditions, flanked by a house and natural barriers, our skilled operation of large machinery made success possible.